IT and Telecom Services

Projects
Every project that Filcom Technologies LLC has completed is held to the highest standards. Our work has taken us from low key engagements such as the Beirut Tunnel Projects to the heights of the world-renowned Burj Khalifa.
We are passionate about the work that we do and are proud of what we have achieved. The projects we have completed speak for itself: It is our unwavering commitment to total customer satisfaction.

1998:
DEWA
Filcom did the fiber optic splicing, testing and commissioning of the OPGW cables and SCADA systems for the following DEWA Substations:
-
Jebel Ali Substations to Emirates Tower Substation
-
Oud Metha Substation to Etisalat Substation
-
Oud Metha Substation to Al Ghusais Sub Station

2003:
Bahrain Formula One Racetrack
Technology giant SIEMENS engaged Filcom as its Consultant to conduct a full sttudy and design of the network infrastructure of the Bahrain Formula One racetrack. We designed the structured cabling for data and telecom networks, equipment interfacing and communication boards.

2003:
Aden Refinery, Yemen
Filcom designed and implemented the full network infrastructure of fiber optic cables that connected all 17 buildings as well as installed and configured all the active network components.

2003:
Dubai Airport Tunnel
(Beirut Tunnel)
Built at the cost of AED 686 million (US$ 190 million) and stretching 1.6 km long, FIlcom was chosen to do the installation of CCTV cameras, fiber optic cables, fire fighting equipment and road safety signs. We also installed the fiber optic cables for the humidity and temperature sensors.

2003:
The Platinum Luxury Yacht
We designed and installed a sophisticated cabling ssytem for the most luxurious ship in the world at that time. Cat7a cables specially designed for ships of this class was used on the Platinum yatch. We modified the telecom cabinets that were supplied to conform to ship building standards.

2000:
Gulf News Editorial and News Office
We provided the design, supply, and installation of around 5,000 UTP cables and 50 runs of multimode fiber cables at the Gulf News offices. Filcom also migrated and activated all the telephone lines for around 400 employees.

2003:
Khaleej Times Printing Office
Filcom did the design, installation, termination, testing, and commissioning of the structured cabling system for the Khaleej Times. The network infrastructure consisted of around 2,000 network points and 26 runs of multimode fiber optic cables.

2003:
Bahrain Petroleum Corporation
(BAPCO)
We did the supply, installation and termination of the entire fiber optic network infrastructure in the refinery. Special fiber optic cables designed for petroleum companies were used. Approximately 5,000 fusion splicing were implemented and 50 telecom cabinets were distributed to various IDF control rooms as well as the main control room.

2003:
EMAAR 2000 Villas
Filcom made a record time accomplishment by installing, terminating, testing, and commissioning the structured cabling system for around 2,000 villas.

2003:
Abu Dhabi Company for Onshore Oil Operations
We undertook the project management, supply and installation for around 7,000 UTP nodes, linking all the buildings with multi-pair voice grade outdoor tyoe cables for telephone applications and 24 core fiber optic cables for their data applications.

2004:
Department of National Residency Dubai (DNRD)
We did the project management, installation, testing and commissioning for 4,000 UTP Cat6 cables. Filcom credits itself for single handedly executing the supply and installation of the structured cabling requirements for all the DNRD branches including the Immigration Station in the Dubai-Oman border.

2004:
RAK Free Trade Zone Authority
We were responsible for the project management, design, supply and installation of the structured cabling systems for all the buildings, including the design and installation of the main data center cables.

2005:
Etisalat Al Kifaf
We did the project management, installation, testing and commissioning for 5,000 UTP Cat7 cables. It was in this project that Cat7 cables were installed for the very first time in the entire UAE. The fiber optic cables in the IDFs were all fusion spliced. We also did the installation of all the telecom cabinets and equipment.

2007
The Sentinel Towers
Jebel ALi Free Zone Authority
(JAFZA)
Filcom installed the security cameras and door access control systems for the entire building. The task considered of installing around 500 cameras and door access controls for all the doors.

2008
DU P101 (OSP and ISP)
Since 2008, FIlcom has been handling all the OSP and ISP requirements under P101. This includes all the copper cable installation for network cabling and wifi.
One of our noted accomplishments in this project was the pulling of 17 kilometers of cables the Dubai- Al Ain Road leading all the way to Sheikh Maktoum's Palace. The pulling of cables was completed in a record time of just 15 days including the implementation of the containment system.

2008
du-Filcom CSM and ENT
Service Assurance Contract
Filcom was one of the first companies to be invited by du-EITC to outsource its technical resources to handle the Enterprise and Consumer Fixed Service Assurance side. Today, FIlcom maintains one of the largest and highly skilled outsource teams in du composed of 70 network Engineers, Field Technicians and Admin Staff.

2010
Du Telecom
Filcom had done numerous GSM sites installation for Du, Telecom, from site search, site surveys, site acquisition up to the implementation covering civil works and commissioning of the sites.
​

2013;
Deira City Center
Filcom maintains strong business ties with the Majid Al Futtaim (MAF) Group specifically with the management of the City Centre chain of stores. In Deira City Centre, we did the CCTV installation for 750 units, including its cabling infrastructure, WIFI networks design, supply, and installation.

2013
Sharjah City Center
Our exceptional work at Deira City Centre convinced MAF to engage Filcom's services a second time. At the Sharjah City Centre, we installed 700 CCTVs including the design and installation of fiber optic network infrastructure. We also executed the network design, supply and installation of wifi system. We also did the UTP and fiber cabling.

2014
Mall of the Emirates
We capped our CCTV installation of up to 2,000 units with the work we completed at the Mall of the Emirates. Filcom provided the design and installation of fiber optic network infrastructure. We were also behind the WIFI network design, supply and installation of the WIFI system including the fiber and UTP cabling.

2013
Mirdiff City Center
Engaging our expert services a third time, Filcom did the CCTV installation of 800 units including the design and installation of fiber network infrastructure. We also did the design, supply, and installation of the wifi system as well as the fiber and UTP cabling.

2014 to date:
Dubai Marina GPON
Since October 2014 FIlcom, in partnership with Alcatel Lucent France, has been migrating Optical Network Terminals (ONTs) to replace the existing FIber Optic system in the Dubai Marina Area. By early January 2015, Filcom's GPON team of 18 dedicated technicians successfully migrated close to 2,000 ONTs covering 11 buildings in the Marina area. Phase 2 of the project poses a serious challenge to the Filcom GPON Team as this will entail migrating at least 4,000 ONTs.